Last edited by Kagakora
Wednesday, August 5, 2020 | History

1 edition of Final environmental assessment found in the catalog.

Final environmental assessment

Final environmental assessment

Whitney Canyon--Carter Creek natural gas processing projects in Uinta and Lincoln Counties, Wyoming, Rich County, Utah

  • 293 Want to read
  • 33 Currently reading

Published by Bureau of Land Management, Rock Springs District in [Rock Springs, Wyo.] .
Written in English

    Subjects:
  • Gas manufacture and works -- Environmental aspects -- Utah,
  • Gas manufacture and works -- Environmental aspects -- Wyoming,
  • Environmental impact analysis -- Utah,
  • Environmental impact analysis -- Wyoming

  • Edition Notes

    Other titlesWhitney Canyon--Carter Creek natural gas processing projects in Uinta and Lincoln Counties, Wyoming, Rich County, Utah
    StatementDepartment of the Interior, Bureau of Land Management
    ContributionsUnited States. Bureau of Land Management. Rock Springs District
    The Physical Object
    Pagination1 v. (various pagings) :
    ID Numbers
    Open LibraryOL14913574M

    Final Environmental Assessment. February Prepared by: The US General Services Administration. With Technical Assistance from: USCIS HQ Consolidation Executive Summary Environmental Assessment – i Environmental Assessment. Responsible Agency: US General Services Administration. FAA signed Final Environmental Assessment (EA) for this proposed project on Decem The Final EA was prepared by pursuant to the National Environmental Policy Act of and assessed the potential impact of the proposed Eastgate Air Cargo Facility as well as the No Action Alternative where the proposed air cargo facility at the.

    Final Environmental Assessment Phillips 66 Company Billings LTU Hazardous Waste Permit Renewel page 2 of 7 Facility History The LTU is located approximately nine miles north of Billings, Montana on Alexander Road in the SE1/4. The U.S. Department of Energy (DOE) has completed its Final Environmental Assessment for the project, including the analysis of potential impacts to human health and the environment. DOE has determined that the project would not have a significant effect on the quality of the human environment and the project may proceed.

    construction phase of a project, an Environmental Assessment (EA) is required by the National Environmental Policy Act (NEPA) of This EA will identify a Preferred Alternative that meets the project Purpose and Need and then evaluate and do cument the effects of the proposed project on the surrounding environment. Final Environmental Assessment Environmental Assessment Checklist [Environmental Review Guide HUD CPD , 24 CFR ; Ref. 40 CFR &] Evaluate the significance of the effects of the proposal on the character, features, and resources of the project area.


Share this book
You might also like
Guerilla warfare

Guerilla warfare

The action of the Interior department in forcing the Standing Rock Indians to lease their lands to cattle syndicates.

The action of the Interior department in forcing the Standing Rock Indians to lease their lands to cattle syndicates.

Special topics in analysis

Special topics in analysis

Park and Ride Workshop, Wednesday 27 June 1990, HertfordCollege, Oxford

Park and Ride Workshop, Wednesday 27 June 1990, HertfordCollege, Oxford

Plenary lectures presented at the International Conference on the Chemistry of Materials at High Temperatures

Plenary lectures presented at the International Conference on the Chemistry of Materials at High Temperatures

Design and Performance Evaluation of a Main Memory Relational Database System

Design and Performance Evaluation of a Main Memory Relational Database System

Does employment protection inhibit labor market flexibility?

Does employment protection inhibit labor market flexibility?

Mattie-Jo-Calico

Mattie-Jo-Calico

Katutura revisited, 1986

Katutura revisited, 1986

Home-made, for flute, soprano, double bass [and] percussion.

Home-made, for flute, soprano, double bass [and] percussion.

Teaching principles and procedures for Gregg shorthand

Teaching principles and procedures for Gregg shorthand

The faithful and diligent Christian described and exemplified, or, A sermon (with some additions) preached at the funeral of the Lady Elizabeth Brooke, the relict of Sir Robert Brooke

The faithful and diligent Christian described and exemplified, or, A sermon (with some additions) preached at the funeral of the Lady Elizabeth Brooke, the relict of Sir Robert Brooke

The life of Dean L-ch by a Yeoman of Kent. No Canterbury tale

The life of Dean L-ch by a Yeoman of Kent. No Canterbury tale

Advanced computer science and information technology

Advanced computer science and information technology

Scribner reading series

Scribner reading series

Final environmental assessment Download PDF EPUB FB2

Environmental Assessment of 14 Factors Evaluated as Potential Causes of the Rat Eradication Failure 14 Consequences of Rabbit Eradication 15 Plant Restoration 15 Feasibility Assessment 15 2.

Purpose and Need 17 Introduction 17. Final Environmental Assessment – D Street Fill Page ES-1 D St FINAL Environmental 9/29/ EXECUTIVE SUMMARY Introduction: This final environmental assessment (EA) has been prepared by the U.S. Fish and Wildlife Service (Serviceor USFWS) to describe and analyze the environmental effects of the.

FINAL ENVIRONMENTAL ASSESSMENT BEAVER DAMAGE MANAGEMENT TO PROTECT COLDWATER ECOSYSTEMS, FOREST RESOURCES, ROADS AND BRIDGES, SENSITIVE HABITATS AND PROPERTY IN WISCONSIN Prepared by: United States Department of Agriculture Animal and Plant Health Inspection Service Wildlife Services In cooperation with Wisconsin.

Final Environmental Assessment for Conversion of a Portion of Fort Niagara State Park For adaptive re-use of Historic Buildings And acquisition of replacement lands at Bear Mountain State Park Prepared by: Karen Terbush, Environmental Analyst 2 Edwina Belding, Environmental Analyst 2 NYS Office of Parks, Recreation and Historic Preservation.

The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C.

and a Memorandum of Understanding dated Decemand executed by FHWA and TxDOT. Final Environmental Assessment. This Final Environmental Assessment (EA) evaluates Western Area Power Administration’s (Western’s) Transmission Line and Interconnection (Proposed Action) for the AIP.

The Proposed Action would extend Western’s existing Tracy-Los Vaqueros kilovolt (kV) transmission line from near CCWD’s existing Old River Pump Station.

Final Environmental Assessment Port of Tillamook Bay New Construction Projects Tillamook, Oregon FEMA Public Assistance Program FEMADR-OR Febru U.S. Department of Homeland Security FEMA Region X th Street SW Bothell, WA Final Environmental Assessment Groom Road Emergency Temporary Housing Site Baker, East Baton Rouge Parish, Louisiana FEMADR-LA 4 F.

Site Selection Process: NEPA requires investigation and evaluation of reasonable project alternatives as part of the project environmental review process. In order to expedite the site selection process.

FINAL. ENVIRONMENTAL ASSESSMENT. Gray Wolf Damage Management in Idaho. for. Protection of Livestock and other Domestic Animals, Wild Ungulates, and Human Safety.

Prepared by. United States Department of Agriculture. Animal and Plant Health Inspection Service. Wildlife Services. in Consultation With. Idaho Department of Fish and Game. Final Environmental Assessment for the Proposed Construction, Alteration, and Maintenance for U.S.

Customs and Border Protection Ajo Housing Development Project Ajo, Arizona Prepared for: Department of Homeland Security U.S. Customs and Border Protection Headquarters, Facilities Management and Engineering Division Washington, D.C.

Prepared by. The DOE prepared this Environmental Assessment (EA) in accordance with the National Environmental Policy Act (NEPA; 42 United States Code [USC] et seq.), Council on Environmental Quality (CEQ) NEPA implementing regulations (40 Code of Federal Regulations [CFR] Parts −), and DOE NEPA implementing procedures (10 CFR ).

The EA. In the Service prepared a FINAL ENVIRONMENTAL STATEMENT, ACQUISITION OF LANDS FOR THE SAN FRANCISCO BAY NATIONAL WILDLIFE REFUGE, CALIFORNIA, hereafter referred to as FES Since much of the material in the environmental statement is still applicable, it complements and supplements this environmental assessment.

Final Environmental Assessment Supporting the Eagle Pass South Checkpoint Renovation and Expansion Maverick County, Texas Responsible Agencies: Department of Homeland Security, U.S.

Customs and Border Protection. Affected Location: Eagle Pass South Checkpoint, Maverick County, Texas. Report Designation: Final Environmental Assessment (EA).

COVID Resources. Reliable information about the coronavirus (COVID) is available from the World Health Organization (current situation, international travel).Numerous and frequently-updated resource results are available from this ’s WebJunction has pulled together information and resources to assist library staff as they consider how to handle coronavirus.

FINAL ENVIRONMENTAL ASSESSMENT C Ditch/Needle Rock Pipeline Project Delta County, Colorado Prepared For U.S. Bureau of Reclamation Colorado River Basin Salinity Control Program and C Ditch Company Prepared By Rare Earth Science, LLC PO Box Paonia, Colorado Octo the carrying capacity of the NCTC.

This environmental assessment. examines potential strategies and programs to manage the deer herd on the. NCTC within a relative index of approximately deer. This index is. actually the exact counts observed on quarterly spotlight deer counts. It is. FMCSA prepared a Final Environmental Assessment for the Hours-of-Service (HOS) Final Rule that makes changes to the HOS regulations issued in The HOS regulations apply to operators of commercial motor vehicles (CMVs) and CMV drivers engaged in interstate commerce, and address requirements for driving, duty, and off-duty time; a.

Final Environmental Assessment The second paragraph in the no action alternative (page ) has been revised as indicated below: Under the No Action Alternative the levee would continue degrading due to lack of maintenance and natural processes.

It would likely breach during a high water or storm event, causing waters to flood into the site. Note to Readers This Final Environmental Assessment for Land Management at the National Conservation Training Center contains changes that reflect public comments on the draft environmental assessment (EA).

One significant change made in response to comments was to reconsider prescribed burning in woodland areas as a possible activity. The DOE initiated the environmental assessment in May and released the draft environmental assessment in June for public comment.

Public meetings were held in Illinois and in South Dakota. In Octoberthe DOE issued the final environmental assessment and determined that the LBNF/DUNE project will have no significant impact. This Environmental Assessment (EA) is written pursuant to the National Environmental Policy Act (NEPA) of Pursuant to the Clean Water Act (CWA), a Section (b)(1) Evaluation of the environmental effects of the discharge of fill material into waters of .FINAL ENVIRONMENTAL ASSESSMENT Clipper Irrigation Salinity Control Project 4 Smith Fork Project Delta County, Colorado Prepared For U.S.

Bureau of Reclamation Colorado River Basin Salinity Control Program and Crawford Clipper Ditch Prepared By Rare Earth Science, LLC PO Box Paonia, Colorado Ap This Environmental Assessment (EA) is tiered to the FEIS in accordance with the Council on Environmental Quality regulations for implementing the National Environmental Policy Act of (NEPA) (40 CFR and 40 CFR ).

This EA provides the basic background information necessary for the site-specific analysis of the potential.